The Problem:
Energy projects face a 15-year wait to connect to the UK’s electricity grid.
Grid connection applications have quadrupled as Britain eyes net zero.
The current grid connection queue at transmission and distribution stands at over 600GW, more than three times the entire grid’s capacity.
National Grid Electricity Transmission is investing £9bn in its network from 2021 to 2026 to maintain, adapt and upgrade its infrastructure.The Solution:
VOLTQUANT Insight platform aggregates data from dozens of data sources and displays it in a fresh format in one easily accessible location.
The Insight platform is designed to analyse plots of land for their ability to host energy-consuming or generating projects.
Experience a fully integrated grid connection process with our streamlined 1-2-3 step approach.The Differentiator:
VOLTQUANT's proprietary algorithm for analysing transformers is the differentiating factor and reason for our traction. Biggest Achievement:
Successfully piloting our solution with the largest developers in the UK.